1.Step one: fix the column
2.Part 2: Borrow a crane to lift the roof into the air, and use hexagon socket bolts to connect the roof and columns.
Fix the four corners in the same way.
3.Step 3: Installation of wall panel slots. This step has already been installed during packaging at the factory and does not require the customer to install it again.
6.Step Six: Installation of Socket Cord
7.Step 7: After the top and left sides of the wall panel are reinforced with 75mm drill tail wire, install the inner corner buckles.
8.Step 8: Installation of the inner corners of the column. The cut here is because the customer wants to install an air conditioning socket here.
9.Step 9: Window Installation