A production timeline needs an agreed starting line.
At FANYE, the production schedule is agreed after the drawings and configuration are confirmed. Here is the work that leads to that point—and the delivery stages that follow it.
An inquiry is not an approved production configuration
A message saying “I would like a houseboat” starts a useful conversation. It does not yet tell the production team the size, material arrangement, room layout or equipment list. We first turn those decisions into a configuration that both sides understand.

The drawing has consequences inside the structure
The open frame in our archive shows how connected those choices are. Rooms, service routes, equipment positions and the supporting arrangement must work together. Agreeing the configuration before production helps the team work from the same reference.
The production period and its start requirements must be confirmed for the selected drawings, equipment and order scope. Record the agreed schedule in the commercial documents, and plan inspection, shipping and destination work separately. A reference in older material is not a current delivery commitment.
Plan the full sequence
- 01
Project brief and options
We review the intended use, water conditions, size, quantity, propulsion, destination and budget.
- 02
Drawing and equipment confirmation
The agreed layout and configuration establish the reference for the order and production plan.
- 03
Manufacturing
The selected structural, exterior, interior and equipment work is carried out against the agreed scope.
- 04
Inspection and requested assessment
Plan the agreed factory review and any separately requested third-party work.
- 05
Packing, booking and transport
Coordinate actual cargo information, carrier arrangements and the destination responsibilities.
- 06
Local receiving and readiness
Customs, unloading, inland movement and site arrangements complete the route to use.
What happens if the plan changes?
| Change | What needs another look |
|---|---|
| Layout or dimensions | Drawing revision, structure and possibly the transport envelope. |
| Material arrangement | Fabrication scope and the applicable specification. |
| Major equipment | Availability, installation, weight and service access. |
| Assessment requirements | Third-party scope, documentation and scheduling. |
| Destination or required date | The available shipping and receiving plan. |
We record changes with the configuration rather than leave an old timing promise attached to a new design. This is especially useful for hospitality projects where a public opening date depends on several parties beyond the manufacturing team.
What can the customer prepare while we build?
The site
Coordinate the mooring location, shore connections and any local permissions with the appropriate parties.
The receiving plan
Identify the destination port, local handling and final access arrangements.
The handover
Agree the documents, walkthrough questions and operating information relevant to the selected equipment.

Questions we discuss with buyers
Can production start before every finish is selected?
The required level of configuration approval and the effect of any open choices must be agreed for the order. Do not assume that an unfinished specification starts the same clock.
Is a requested assessment automatically included in the production schedule?
No automatic inclusion is assumed. If requested, the independent third-party scope and schedule need to be agreed as part of the project planning.
Tell us the date you want to use the boat.
We can discuss the configuration and the whole delivery sequence, then separate the production plan from the shipping and destination stages.
Continue planning: See the production process · Plan transport separately
Photography and design references: FANYE company material library. Images show selected project examples; each order follows its own approved drawings and equipment list. Design illustrations are identified in the captions. Reference specifications and options are confirmed for the individual project.