CUSTOM HOUSEBOAT BUYER RESOURCES
A houseboat inspection should connect the boat you see to the drawing and equipment list you agreed. Before shipment, decide what will be checked, which records will be supplied, who will review exceptions and what must still be completed at the destination. A factory check, an independent survey, transport acceptance and site commissioning are different stages.
FANYE is the export brand for our custom houseboat business, with manufacturing in Xinghua, Jiangsu, China. The checklist below is a starting point for discussing a project-specific inspection and handover scope; it does not describe a universal package included in every order.
Discuss your inspection and handover requirements
Use this checklist for a new build, not a used-boat purchase
This page helps a buyer organize the agreed scope and records for a newly built houseboat. It is not a used-boat condition survey or a pre-departure boating safety checklist. The checks required depend on the selected design, equipment, destination and intended use.
Start with the version everyone is checking
Before booking an inspection, bring the approved layout, equipment schedule and current change record together. Mark the drawing revision and identify which options are included. A showroom photograph or a previous project is useful context, but it cannot replace the agreed specification for your boat.
For layout decisions, use our houseboat floor plan references. For deciding what belongs in the price, see the quotation scope checklist. This page focuses on checking the agreed result and recording the next actions. For wastewater configuration, use our houseboat sewage system planning guide.
Build a project inspection record
Discuss the following areas with the builder and, where needed, a suitably qualified independent specialist. Agree the methods, access, acceptance criteria and records before the visit. These are subjects for an inspection plan, not instructions for performing electrical, structural or lifting tests yourself.
| Area to discuss | Record to request or agree | Question to resolve |
|---|---|---|
| Drawing and configuration | Current drawing revision, change list and included-equipment schedule | Does the inspected boat match the agreed version? |
| Structure and accessible finishes | Agreed inspection scope, findings and any areas that could not be accessed | Which items were checked, and which need specialist review? |
| Doors, windows and interior fittings | Recorded observations against the agreed fit-out | Are there open items or substitutions to resolve? |
| Water and electrical systems | Agreed checks and relevant results for installed systems | What can be demonstrated at the factory, and what depends on shore services? |
| Propulsion, if selected | Equipment identification and the agreed installation or demonstration scope | Is propulsion included, and what remains before operation? |
| Requested documents | Project-specific list of manuals, drawings and applicable assessment documents | Which documents apply to this model and destination? |
What photographs can and cannot establish
A dated photograph can document an accessible detail or visible condition at that moment. A video may show a particular demonstration, but it does not by itself establish the full test scope, concealed condition or destination approval. Ask what was demonstrated, against which specification, and which areas or conditions were not covered. Have a qualified reviewer agree the evidence needed; do not infer a pass from the existence of a video.
Keep inspection, shipment and site handover separate
| Stage | Decision to record |
|---|---|
| Before shipment | Findings, agreed corrections, recheck evidence and any explicitly outstanding items |
| Transport handover | Condition record, packing scope and the agreed allocation of transport responsibilities |
| At destination | Arrival condition, site connections, commissioning responsibilities and documents still required |
A successful factory demonstration does not establish that a site has the required utilities, permissions or access. Confirm the destination work separately. Transport arrangements also need to match the approved boat: see how size changes affect logistics planning.
Agree how open items will be closed
Use one shared list rather than scattered messages. Give each item a reference, describe the finding, name the responsible party and record the evidence needed to close it. Distinguish completed corrections from items awaiting a recheck or work at the destination. How unresolved items affect acceptance or shipment should be agreed in the project documents.
| Open-item record field | What to agree |
|---|---|
| Reference and drawing revision | Identify the item and the version being checked. |
| Finding and agreed action | Distinguish an observation, an approved change and a correction. |
| Responsible party and next review | Name the owner and agree when evidence will be reviewed. |
| Evidence, status and unresolved scope | Record what was actually checked, whether a recheck is needed and what remains open. |
If an independent surveyor is involved, define their scope and exclusions directly. The IIMS Small Craft Code of Practice explains the importance of recording survey limitations. It does not establish that FANYE or a particular boat has been independently surveyed.
Shipping terms do not replace the inspection and acceptance agreement. The International Trade Administration overview explains that Incoterms allocate trade responsibilities but do not define every sales-contract issue, including payment timing or transfer of ownership. Confirm these matters in the project agreement rather than assuming a standard retention percentage.
Prepare a useful FANYE project enquiry
Send your destination, intended use, proposed layout and current project stage. Tell us whether you want to discuss a factory visit, an independent inspection, pre-shipment records or destination handover. Identify any documents requested by your surveyor, insurer, marina or local authority so that availability and responsibilities can be reviewed before ordering.
For a visit, read planning a factory appointment. For the wider product discussion, explore custom houseboat project options.
Questions before inspection and handover
Does every FANYE order include the same inspection package?
No universal package is stated here. Agree the inspection scope, records, access arrangements and any independent services for the specific order.
Can photos or a video replace an independent survey?
Photos and video can help document visible details. They do not show every concealed area or establish that specialist checks were completed. Agree the evidence and any independent review needed for your project.
Does a factory check mean the boat is approved for my destination?
No. Model-specific documentation, local permissions, mooring arrangements and intended use must be reviewed separately for the destination.
What should I do if an item differs from the drawing?
Record it against the current drawing revision, clarify whether it is an agreed change or an open item, and agree the correction and recheck process in writing.
Is delivery the same as commissioning?
They are separate activities. Confirm who handles unloading, shore connections, commissioning and any site checks; do not assume those services are included in freight.
Which information should I send first?
Send the destination, intended use, current layout or specification, project stage and the inspection or handover questions you want to resolve.
Plan the checks before the boat is shipped
Share the project stage and your inspection requirements. FANYE can review the requested scope with you; specific services, documents, dates and costs require written confirmation.
Public contact: fanyehouseboat@gmail.com