FANYE / XINGHUA HOUSEBOAT JOURNAL
A finished cabin hides the most important part of a houseboat.
Come inside our Xinghua production story: the structure below the floor, the equipment access behind the finish, and the decisions that turn a good-looking concept into a usable floating space.
Start underneath the room

The layout reaches all the way down to the frame
In our production photographs, the floor is still open. That is the moment to think about more than bedrooms: where the tanks sit, how equipment can be reached, and how the structure supports the planned use. At FANYE, the accommodation layout and hull or pontoon arrangement belong in the same configuration discussion. A private retreat, a guest cabin and a floating restaurant do not begin with the same brief.
Our manufacturing site is in Xinghua, Jiangsu, China. With 10 years of houseboat manufacturing experience and approximately 200 houseboats produced annually, we work across compact leisure units and larger customized projects. The benefit for a buyer is a wider choice of arrangements—not a requirement to accept one standard floor plan.
From a drawing to a place on the water
- 01
Define the project
We start with the water location, purpose, size, number of units, propulsion needs and budget. A moored resort room needs a different discussion from a houseboat intended to move.
- 02
Connect the drawing and specification
The plan records rooms, circulation, deck access and equipment spaces. The quotation identifies materials, fitted equipment and options against the agreed revision.
- 03
Build the structure and enclosure
Hull or pontoon preparation, structural assembly and exterior work follow the selected configuration. Photographs can document the relevant progress on the actual order.
- 04
Install the interior and systems
Interior finishes, water-system components and electrical equipment are coordinated with the configuration. Accessible service spaces deserve attention before they are closed in.
- 05
Review readiness for dispatch
The agreed inspection items, documents, packing and loading arrangements are reviewed before the vessel leaves. The shipping plan has its own carrier and destination requirements.
What we can shape around your project
Material and hull arrangement
Steel, stainless steel, aluminum, PE pontoon and fiberglass solutions are available. Flat, twin and triple hull arrangements are reviewed against the project.
The space people use
Room allocation, glazing, deck access, exterior finish and interior styling can be discussed around private living or hospitality use.
Equipment and delivery
Propulsion, shore connections, onboard equipment, packing and freight are scoped for the selected vessel rather than assumed from a catalogue image.
Steel, stainless steel, aluminum and PE pontoon projects support one-unit customization. Fiberglass projects typically start from three units because the design and mould arrangements matter. We explain those decisions before moving a brief into an order.
Quality conversations should have documents behind them

FACTORY DOCUMENTATION
Review the named holder and the scope
Our company library includes a two-page ISO 9001:2015 certificate supplied for the Yuanmeng factory, under the printed holder Jiangsu Yuanmeng Zhizao Technology Engineering Co., Ltd. Its stated scope is houseboat manufacturing, excluding qualification licensing.
The document carries the issue date 8 September 2026 and expiry date 7 September 2029. Request the complete copy and current status verification for your due diligence. This management-system document is separate from a vessel-specific CE assessment.
If your project requires CE assessment, we can discuss an independent third-party assessment after production. Its scope, documents, timing and fees are agreed separately for the vessel and destination. We keep that process distinct from a factory quality-management certificate.
Build time is one part of delivery
Questions we discuss with buyers
Can I follow my build remotely?
Ask us to agree suitable photo or video milestones for the actual order. Drawings, configuration and changes should remain tied to the same project record.
Can I visit before placing an order?
Yes. Factory visits are welcome by appointment in Xinghua. Confirm your project questions and travel route with our team in advance.
Show us the space you want to create.
Send the destination port, intended use, water conditions, preferred size, propulsion needs and budget range. We can begin with a practical configuration discussion.
Continue planning: Plan a factory visit · Plan the shipment
Photography and design references: FANYE company material library. Images show selected project examples; each order follows its own approved drawings and equipment list. Design illustrations are identified in the captions. Reference specifications and options are confirmed for the individual project.


Add comment